06-13-2014, 03:33 PM
(This post was last modified: 06-13-2014, 03:56 PM by Fatal Unfair.)
I got some parts today for my new PC, but motherboard and DVD-drive only coming next week. Still going with my old Radeon HD6850 GPU until new gpu's are released or the current ones get a huge discount in Finland. I am so hyped that I had to post this here because I can't put it together yet -.-. God damn CDON online store, said 1-3 day posting but in reality it's going to be 5 work days or more.
Btw list of parts:
Mobo: Asus H97-PRO Intel H97 LGA 1150
Processor: Intel Xeon E3-1231 v3 (Basicly I7-4770 without overclocking possibility and no integrated GPU, less TDP)
HDD: Western Digital 1TB Caviar Blue
SSD: PNY 120GB XLR8
PSU: XFX TS 550W Gold
RAM: Kingston 8GB (2x4GB) HyperX Fury, DDR3 1600MHz, CL10, 1.5V
GPU: Asus Radeon HD 6850
Sound card: Asus Xonar DG
Case: Bitfenix Shinobi Window (2 pre-installed fans, bought 2 extra)
Btw list of parts:
Mobo: Asus H97-PRO Intel H97 LGA 1150
Processor: Intel Xeon E3-1231 v3 (Basicly I7-4770 without overclocking possibility and no integrated GPU, less TDP)
HDD: Western Digital 1TB Caviar Blue
SSD: PNY 120GB XLR8
PSU: XFX TS 550W Gold
RAM: Kingston 8GB (2x4GB) HyperX Fury, DDR3 1600MHz, CL10, 1.5V
GPU: Asus Radeon HD 6850
Sound card: Asus Xonar DG
Case: Bitfenix Shinobi Window (2 pre-installed fans, bought 2 extra)